Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
viproma:about [2017-06-13 08:04]
lars
viproma:about [2018-04-06 06:43] (current)
lars Change forskningsrådet.no links to point to English pages
Line 56: Line 56:
  
 ===== Project facts ===== ===== Project facts =====
-The ViProMa project was primarily funded (80%) by the [[http://​www.forskningsradet.no|Research Council of Norway]] through its [[http://​www.forskningsradet.no/​prognett-maroff/​Forside/1228296528786|MAROFF]] research programme (grant no. [[https://​www.forskningsradet.no/​prosjektbanken/#​!/​project/​225322/​no|225322]]). The RCN project type was [[http://​www.forskningsradet.no/​no/Kompetanseprosjekt_for_neringslivet/1253963327832|"​knowledge-building project for industry"​]].+The ViProMa project was primarily funded (80%) by the [[https://​www.forskningsradet.no/​en/​Home_page/​1177315753906|Research Council of Norway]] through its [[https://​www.forskningsradet.no/​prognett-maroff/​Home_page/1228296528774|MAROFF]] research programme (grant no. [[https://​www.forskningsradet.no/​prosjektbanken/#/​project/NFR/225322/Sprak=en|225322]]). The RCN project type was [[https://​www.forskningsradet.no/​en/Knowledgebuilding_project_for_industry/1253963988225|"​knowledge-building project for industry"​]].
  
 [[http://​vard.com|Vard]],​ [[http://​rolls-royce.com|Rolls-Royce Marine]] and [[https://​dnvgl.com|DNV GL]] provided the remaining 20% of the financing. The total budget was NOK 15,000,000 and the project spanned a period from 2013 through 2016. [[http://​vard.com|Vard]],​ [[http://​rolls-royce.com|Rolls-Royce Marine]] and [[https://​dnvgl.com|DNV GL]] provided the remaining 20% of the financing. The total budget was NOK 15,000,000 and the project spanned a period from 2013 through 2016.
  • viproma/about.txt
  • Last modified: 2018-04-06 06:43
  • by lars